Working with RG Group and in keeping with the Zara concept of open plan design and minimal columns within the retail space, Apex Steel have been tasked with providing 19 metre long plate girders, some weighting in at 20 tonnes each.
These will be fitted overnight utilising a 250 tonne crane to minimise the disruption of the very busy Bluewater shopping Centre.